What´s really new in Simplified DBR
by Eli Schragenheim, Amir Schragenheim, Amir Weisenstern
Level of TOC knowledge: Intermediate
TOC Application
for:
Operations/Production TOC Applications: Drum-Buffer-Rope, Buffer Management
Industry: Manufacturing
|
Description: Production planning and capacity scheduling of the Capacity Resource Constraint (CCR) is not always simple or right. The direction of the solution is a basic Simplified DBR (SDBR) which does not lose the benefits of scheduling the CCR. Presented during the TOCICO Annual Conference (Miami, FL - November 2006). Length: Full Video: 1hr 33min; Free excerpt: 5min Language: English Format: DVD, OnDemand internet video streaming, Download |
|